97伦伦午夜电影理伦片,99久久性一交一伦一情精品,福利 亚洲 丝袜 老司机,久久久久亚洲Av片无码
Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > EPC general contracting project for the construction of the coal preparation plant of Shanxi Shouyang Duanwang Group Youzhong Coal Industry Co., Ltd
8山西壽陽(yáng)段王集團(tuán)友眾煤業(yè)有限公司選煤廠建設(shè) EPC 總承包項(xiàng)目.jpg
  • 8山西壽陽(yáng)段王集團(tuán)友眾煤業(yè)有限公司選煤廠建設(shè) EPC 總承包項(xiàng)目.jpg

EPC general contracting project for the construction of the coal preparation plant of Shanxi Shouyang Duanwang Group Youzhong Coal Industry Co., Ltd

Type: Power coal/blast furnace injection coal preparation plant

Scale: 1.20Mt/a

Contracting mode: EPC general contracting, new construction projects

Process: The raw coal from the main shaft is classified by 50mm in the screening workshop, and the+50mm large coal blocks are manually selected and removed as lump coal products. The -50mm raw coal is stored in the raw coal storage shed and transported to the main plant through a washing belt; Within the main factory building, a pressurized three product heavy medium cyclone separator is used for separation of -50mm or 50-6mm; Coarse coal slurry CSS separation+fine coal slurry flotation combined process, flotation can be opened or not according to the type of coal being washed. Flotation clean coal is dehydrated and recovered using a filter press, and the tail coal slurry is concentrated in a thickener and then dehydrated and recovered using a filter press. The washing water is circulated in a closed loop, which is environmentally friendly and energy-saving.


97伦伦午夜电影理伦片,99久久性一交一伦一情精品,福利 亚洲 丝袜 老司机,久久久久亚洲Av片无码